Data-hall work is repetitive and unforgiving. Every rack is the same until one is out by a hole, and then the containment does not land and the whole row moves.
We build data halls and comms rooms to a set-out drawing and a labelling standard, and we test everything before the client's equipment arrives.
What we deliver
- Rack and cabinet installation, levelling, bonding and seismic restraint
- Overhead basket, ladder and underfloor containment
- Structured cabling - Cat6A horizontal and fibre backbone
- Fibre trunking, MPO / MTP breakout and patching
- Power distribution to rack - PDU installation and terminations
- Full certification testing prior to equipment handover
- Labelling, port mapping and as-built documentation
Specification
| Reference | AWS greenfield data hall, Takanini |
|---|---|
| Cabling | Cat6A horizontal, OS2 fibre backbone, MPO / MTP trunking |
| Standards | TIA-942, ISO/IEC 11801-5, AS/NZS 3080, NZS 4219 restraint |
| Testing | Tier 2 OTDR on fibre, permanent link certification on copper |
| Handover | Port map, labelling schedule, as-builts, full test results |
Standards we work to
Delivered on live and greenfield data-centre sites in New Zealand.
More services
Delivered under the same package
Service
Supply Chain Management
Procurement, consolidation and staged release of ICT and security materials so the right…
Read more →Service
Vendor Inventory Management
Held stock, spares pools and consignment inventory managed on the client's behalf so critical…
Read more →Service
3PL Logistics
Third-party warehousing, freight coordination and site delivery for hardware that cannot sit in…
Read more →Need this priced?
Send us the drawings and the specification and we will come back with a scope, an exclusions list and a price.
Request a quote