Five domains. One accountable installer.
Power
Sub-mains, PDU and busway distribution, UPS and generator interfaces, earthing and bonding — installed and certified by registered electricians.
White Space Build
Racks, containment and cable pathways delivered to TIA-942 and seismically restrained to NZS 4219.
Fibre & Copper
Fibre backbone, MPO/MTP trunking for high port counts and Cat6A horizontal — every link tested with per-link certification at handover.
Cooling Readiness
Containment and physical infrastructure for high-density and liquid-cooled racks, with load bank support for cooling and electrical commissioning.
Access & CCTV
Gallagher and Inner Range access control, IP CCTV and intrusion — installed on hardened, segregated network infrastructure.
Eight ways into the data hall.
Service
Data Centre Design and Installation
Data hall and comms room build — racks, containment, cabling and cross-connect.
Read more →Service
Data Centre Electrical Fit Out
Distribution, terminations and certification for data halls and plant areas.
Read more →Service
Data Centre Operations
Day-to-day operational support inside the hall — moves, adds, changes and audits.
Read more →Service
Rack and Roll Integration
Racks built, populated, cabled, configured and tested off-site before delivery.
Read more →Solution
Liquid Cooling Infrastructure
The containment, cabling and power that high-density liquid-cooled racks depend on.
Read more →Solution
Load Bank and Commissioning
Load bank hire, connection and support for electrical and cooling commissioning.
Read more →Solution
Compute and HPC Infrastructure
The physical layer behind compute and HPC — high-density cabling, fibre and power.
Read more →Solution
Storage Infrastructure
Rack, cable, power and commission storage platforms to spec.
Read more →Proven on hyperscale programmes.
- AWS Takanini — greenfield data hall
- Microsoft Data Centre — BMS install
- Takanini DC — environmental IoT with Southbase, Adroit & Spark IoT
Why head contractors put us in the hall.
- Single point of contact — cabling, fibre, electrical, security and commissioning under one subcontract package
- Hyperscale delivery record — AWS, Microsoft and Takanini programmes delivered to standard and to programme
- Licensed and insured — EWRB registered electricians, PSPLA approved, $20M public liability and contract works with AIG NZ
- Nationwide mobilisation — 369 crews at 10 bases, 24-hour mobilisation, consistent site packs per location
Building or fitting out a data hall?
Send the package. We will tell you what we can price, what we would exclude, and where we see programme risk.
Request a quote